Summary
Bulk earthworks for a new rail logistics terminal & plant hire
Scope of Works:
- 150,000m3 bulk earthworks to design levels
- 150,000m2 lime stabilisation
- 150,000m2 pavement construction
- Various road and rail tie-ins
- Stormwater pit and culvert construction
- Pavement sealing works
- Level 1 management of earthworks
- Level 1 electrical works – management and installation (JLE)
- 10,000 lineal meters of detailed drainage earthworks
- Compliance and adherence to the Pacific National Requirements
- Completed within Budget and Schedule